Power and Protection System Design Study and Solutions
Power and Protection System Testing and Commissioning
power System Design Analysis Simulators
Equipments
Power System Design and Detail Engineering
Power and Protection System Study and Solutions
Power System Testing and Commissioning
Protection System Relay and scheme Testing
Protection System Modernisation
   
Power System Design and Detail Engineering  
 
 
MBH Power Ltd, Lagos/Vadodara
  (330kV / 132kV 2x320 MVA Outdoor Switchyard and 30MVA Reactor at CALABAR, Nigeria) Electric Power Authority (NEPA) System configuration- main1, main2 and Half Breaker on 330 kV as well as for 132kV. The Design also includes Supervisory Control And Data Acquisition System – SCADA for both local and remote operation Owner Consultant – LA MEHYER/SCOT/NIPA
MBH Power Ltd, Lagos/Vadodara
  132kV / 33kV 2x40 MVA Outdoor switchyard OKADA - BENIN, Nigeria) Electric Power Authority (NEPA) System configuration- main1, main2 and Half Breaker on 132kV and Main and Transfer on 33kV. The Design also includes Supervisory Control And Data Acquisition System – SCADA for both local and remote operation Owner Consultant – LA MEHYER/SCOT/NIPA
MBH Power Ltd, Lagos /Vadodara
  132kV / 33kV 2x60 MVA Outdoor switchyard KARU and KUBWA SS, Nigeria) Electric Power Authority (NEPA) System configuration- main on 132kV and Main on 33kV. The Design also includes Supervisory Control And Data Acquisition System – SCADA for both local and remote operation Owner Consultant – LA MEHYER/SCOT/NIPA
Enercon India Ltd / Larsen & Toubro Limited – ECC, Ahmedabad
  (132kV / 33kV, 2x75MVA Outdoor switchyard at Jaisalmer) System configuration – main and transfer bus. Project designed in 35 days and commissioned in 100 days.
Suzlon Energy Ltd / Larsen & Toubro Limited – ECC, Ahmedabad
  (220kV / 33kV, 2x75MVA Outdoor switchyard at Jaisalmer) System configuration- double main and transfer bus. Project was designed for 132kV and 220kV, with installation of 132kV in the beginning and later conversion to 220kV. Project designed in 45 days and commissioned in 110 days.
Gujarat Electricity Board / Larsen & Toubro Limited – ECC, Ahmedabad
  (220KV / 66kV, 3x100MVA Outdoor switchyard at Utran Power Plant of GEB, Surat) System configuration- double main bus on 220kV and 66KV. Integration of the new bay in the existing system on 220kV side shifting of the existing 220kV bay to a new bay location. Conversion of the existing single bus bays into double bus system on the 66KV level. Integration of the existing 66KV bays into the new 66KV system. The first quad moose bus on 66KV in GEB
Suzlon Energy Ltd.
  Pune (220kV / 33kV, 4x100MVA Outdoor switchyard at Jamde, Maharashtra) System configuration: 220kV double main and transfer bus and 33kV main and transfer. Specification of all equipments for ordering prepared by EEPL.
Suzlon Energy Ltd, Pune
  (220KV / 33kV, 2x100MVA Outdoor switchyard at Valve, Maharashtra) System configuration-double main and transfer bus. Specification of all equipments for ordering prepared by EEPL. Tandem isolator in 220kV bays
Suzlon Energy Ltd, Pune
  220kV / 33kV, 3x100MVA Outdoor switchyard at Suthri, Gujarat) System configuration- double main and transfer bus.
Suzlon Energy Ltd, Pune
  (220kV / 33kV, 2x100MVA Outdoor switchyard at Sangli, Maharashtra) System configuration - double main and transfer bus. Substation design is of high-level design without using tandem isolators.